FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

The Melrose Building 2

Melrose Drive & Corinna Street, Phillip ACT

The Melrose is the first tower in a four-part residential complex in Woden, ACT. It’s just a short distance away from the Parliamentary Triangle and Canberra’s largest hospital, and next door to the Woden Town Centre. The Melrose will comprise of 183 apartments over a 16-storey building with an additional 2 levels of basement car parking. The residents will enjoy large courtyard spaces, stunning city views, and outdoor communal areas including an outdoor heated pool, sun lounge area, podium leisure terrace, and indoor/outdoor rooftop eateries.

The Melrose is another project by Doma Group, who’ve awarded the formwork package to IC Formwork. IC Formwork have chosen to work with FTI Group again for the supply of preformed concrete stairs and handrails. Fast Tread® stairs are being installed across all the fire stair cores with a mixture of single rail handrails and 3 rail handrails. FTI Group is also contracted to complete the site welding works to link up the handrails, forming a continuous BCA Compliant handrail for the fire stairs.

Products Utilised
770 Fast Tread® Risers
254 LM of handrail

16

Levels

2

Basements

1

Building

185

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.