FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Lumina – The Orchards Stage 3

47 Spurway Drive & 104 Fairway Drive, Baulkham Hills NSW

Lumina is Stage 3 of The Orchards, a master planned community by Sekisui House. Lumina comprises 330 apartments with a range of private and communal spaces set in the thriving heart of Norwest, NSW. Lumina is set to bring a new standard of living to The Hills area.

Growthbuilt have been awarded the construction contract and have let the formwork portion to Delta Foundations. FTI Group have a long-standing relationship with Delta Foundations, having worked together on 10 projects over the last 5 years. This is the largest project we’ve supplied to Delta, there’ll be over 1,700 risers of Fast Tread® stairs installed here. Fast Tread® stairs are featured throughout the fire cores in a mixture of circulation and scissor stair applications with single rail and 3 rail handrails.

Products Utilised
1,706 Fast Tread® Risers
9,300 m² of BlueDeck Composite®
563 LM of handrail

13

Levels

4

Basements

1

Building

330

Units

Fast FTI Facts

1500
Projects
35000
Floors
150000
Handrails (LM)

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.