FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Mirvac Switchyard Project

148 - 300 Manchester Road, Auburn NSW

The Switchyard by Mirvac, located in Auburn NSW, offers a wide range of office and warehouse units just 20km from the Sydney CBD. There’s 24/7 B-Double access, container unloading access, CBD quality office accommodation, and an onsite café.

Cityform Concrete Construction has been awarded the formwork package by Prime Constructions who’re the builders. Cityform has a long-standing relationship with FTI Group and has chosen to deal with FTI again for the supply of concrete formwork. There’s BlueDeck Composite™ metal decking being used for the suspended concrete slabs. And Fast Tread® stairs are being used for the warehouse stairs throughout.

Products Utilised
500 Fast Tread® Risers
3,400 m² of BlueDeck Composite®

2

Levels

n/a

Basements

6

Buildings

27

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.