FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Paramount on Parkes

14 - 20 Parkes Street, Harris Park NSW

Paramount on Parkes offers the perfect combination of premium location and relaxing spaces with the convenience of dining, shopping, work, school, transport, and parks all within walking distance. Paramount on Parkes is a 39-storey mixed-used tower by award-winning Sydney apartment developer, ALAND that will feature 331 high-quality apartments in the heart of Sydney’s second CBD at Parramatta, NSW.

After a long-standing relationship with ALAND, having delivered over 22 projects together in the past 6 years, ALAND made the choice to secure the formwork supply with FTI Group. Fast Tread® stairs are featured throughout the fire stair shafts in the tower in a standard fire circulation stair configuration with a mixture of 3 rail handrails and wall-mounted handrails. FTI Group is also contracted to complete the site linkage welding works towards the end of the project to link up the handrails and form a continuous BCA-compliant rail.

Products Utilised
1,969 Fast Tread® Risers
80 Safe-T-Tread™ Treads
650 LM of handrail

39

Levels

6

Basements

1

Building

331

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.