FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Powerhouse Museum

34 - 54 Phillip Street, Parramatta NSW

The NSW Government has started building one of the country’s most complex projects, representing the largest cultural investment since the Sydney Opera House. Powerhouse Parramatta is set to be a globally significant museum project demonstrating the continued impact of the applied arts and sciences on our world through technology, innovation, design and engineering.

It will be the largest museum in NSW and the leading science and technology museum in the Southern Hemisphere. Powerhouse Parramatta will feature over 18,000m² of exhibition space alongside learning and digital studios, a cinema, 800-seat theatre, rooftop garden, restaurants and cafes. From when it opens in 2025, is expected to attract 2 million visitors annually.

Tier 1 builders, Lendlease won the build contract for this development. Lendlease have let the formwork package to Formsite who’ve chosen FTI Group to supply the Fast Tread® preformed stairs and handrails. The stairs are installed mainly as wide flights of stairs in a scissor stair application with corresponding single rail handrails.

Products Utilised
2,089 Fast Tread® Risers
689 LM of handrail

8

Levels

n/a

Basements

2

Buildings

40

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.