FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

The Bond

8 Elizabeth Macarthur Drive, Bella Vista NSW

We’re pretty excited to be working with HD Projects again!

Project: The Bond, Bella Vista

The work-life post-COVID is turning out to be a flexible work life balance with plenty of time to spend with the family. With co-working spaces, private offices and breakout zones you’ll be able to work as a team or individually. And with a childcare on level one and basement carparking, that’s refining what a workplace can be! Innovation, wellness and, workday life bonded together.

FTI will be supplying 349 risers of stairs, plus 155 lineal metres of handrails for this 7 storey build.

Designed by: fitzpatrick+partners
Built by: Buildcorp

Products Utilised
349 Fast Tread® Risers
10,500 m² of BlueDeck Composite®

7

Levels

n/a

Basements

1

Building

n/a

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.