FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Vivacity Stage 2

5 Uhrig Road, Lidcombe NSW

Stage 2 of Vivacity Apartments in Lidcombe, NSW has now commenced and it’s an address like no other. On the doorstep of Sydney Olympic Park which is set to be a thriving city by 2030 with the future Sydney Metro West project, WestConnex and the Parramatta Light Rail project, it’s a visionary new development designed for those to live their life front and centre. Due for completion in 2024, Vivacity Stage 2 will comprise of 584 residential apartments and over 4,500m² of commercial and retail space across 6 buildings of up to 29 storeys each, with 4 levels of basement car parking.

Vivacity is being built by award-winning builder and developer, JQZ who have let the formwork package to Fastform Group Australia. Fastform have chosen to engage FTI Group in the supply of Fast Tread® preformed concrete stairs and metal handrails. Fast Tread® stairs are showcased as standard fire circulation stairs with a mixture of single rail handrails and 3 rail handrails which will be welded by the FTI Site Linkage Team towards the end of the build to form a continuous BCA-compliant handrail.

Products Utilised
3,591 Fast Tread® Risers
1,185 LM of handrail

29

Levels

4

Basements

6

Buildings

583

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.