Pacific Golf Club are building a new retirement, clubhouse, function, and outdoor sport and recreation facility at the existing Pacific Golf Course in Carindale, QLD. Stage 1 will include the construction of the clubhouse as well as 2 buildings of units. The stage 1 buildings will comprise of 52 units over 3 storeys as well as a swimming pool, cinema, billiards, and gym. The new clubhouse building which will feature a bar, restaurant, café, and gaming room will be built prior to the remainder of the redevelopment which will include the existing clubhouse and more residential buildings.
Icon have been awarded the building contract for Stage 1 and have let the formwork package to Direct Formwork. Direct Formwork chose to work with FTI Group for the supply of the concrete fire stair and handrail package, having now worked together on over 15 projects throughout Queensland. FTI’s Fast Tread® stairs are being installed throughout the buildings as the fire stairs in a standard circulation stair configuration with 3 rail and wall-mounted handrails.
• AS/NZS1657:2018 for fixed platforms, walkways, stairways, and ladders • AS/NZS1428.1:2009 for design for access and mobility • AS/NZS1170.1:2002 for structural design actions • AS/NZS3990:1993 for mechanical equipment • AS/NZS4100:1998 for steel structures • AS/NZS4991:2004 for lifting devices • AS/NZS1554.1:2011 for structural steel welding • AS/NZS4761:2001 for steel reinforcing materials
Compliance assured for your peace of mind. For more information, contact our design team.