FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Sol Kirra Beach

133 - 135 Musgrave Street & 27 - 31 Garrick Street, Coolangatta QLD

A new residential tower located on the last development site on Kirra Headland, QLD is set to deliver superior quality for long-term residents. The SOL Kirra Beach tower comprises of 46 two, three, and four-bedroom apartments and penthouses over 11 levels with an additional 3 levels of basement car parking.

Rawcorp are the builders for the construction of SOL Kirra Beach, they have let the formwork contract to Tweed Formwork. FTI Group are pleased to be supplying Tweed Formwork on another of their projects. Fast Tread® stairs are utilised for the fire circulation stairs in the stair core, with single rail and wall-mounted handrails.

Products Utilised
372 Fast Tread® Risers
123 LM of handrail

8

Levels

3

Basements

1

Building

46

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.