FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Vantage Royal Pines – View

406 Ashmore Road, Benowa QLD

‘View’ is the fifth and final stage of Vantage Gold Coast, QLD. Altogether, there are 357 apartments across 6 buildings plus a parkland adjacent to the Royal Pines Resort and the Benowa Village shopping centre. The Vantage Gold Coast masterplan is designed to blend lifestyle, amenity, and leisure and offers stunning panoramic views

 

This stage of Vantage Gold Coast is being built by GCB Constructions who have chosen to engage FTI Group for the supply of preformed concrete stairs and handrails. FTI will be delivering 574 risers of Fast Tread® stairs to this site in the next few months. We’ll also be supplying 189 lineal metres of metal handrails, including the full site welding scope. FTI’s stairs and handrails will be showcased as fire circulation stairs with 3 rail handrails and also as scissor stairs with single rail handrails.

Products Utilised
574 Fast Tread® Risers
189 LM of handrail

10

Levels

2

Basements

1

Building

79

Units

Fast FTI Facts

1500
Projects
35000
Floors
150000
Handrails (LM)

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.