FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Molesworth Place

Haines Street & Molesworth Street, North Melbourne VIC

Molesworth Place is part of the VIC Government’s plan to renew the public housing precinct in North Melbourne, VIC to increase the number of social housing residences and create additional private residences. The Molesworth Place development is set to bring 133 social housing dwellings along with 235 private residences. The design, by McBride Charles Ryan, is a series of 5 interconnecting buildings ranging from 3 to 5 storeys, with shared courtyards and an additional level of basement car parking.

Forza Group have won the formwork package for Molesworth Place and have chosen to secure the stair and handrail package with FTI Group. Fast Tread® stairs are featured through all 5 buildings in the fire shaft as standard fire circulation stairs with 3 rail handrails. The FTI Site Linkage team will be onsite towards the end of the build to weld the handrails, linking them up to form a continuous BCA-compliant handrail. FTI Group is also supplying BlueDeck Composite™ metal decking formwork for the suspended concrete slabs.

Products Utilised
481 Fast Tread® Risers
700 m² of BlueDeck Composite®
159 LM of handrail

5

Levels

1

Basement

5

Buildings

420

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.