Haines Street & Molesworth Street, North Melbourne VIC

Molesworth Place is part of the VIC Government’s plan to renew the public housing precinct in North Melbourne, VIC to increase the number of social housing residences and create additional private residences. The Molesworth Place development is set to bring 133 social housing dwellings along with 235 private residences. The design, by McBride Charles Ryan, is a series of 5 interconnecting buildings ranging from 3 to 5 storeys, with shared courtyards and an additional level of basement car parking.

Forza Group have won the formwork package for Molesworth Place and have chosen to secure the stair and handrail package with FTI Group. Fast Tread® stairs are featured through all 5 buildings in the fire shaft as standard fire circulation stairs with 3 rail handrails. The FTI Site Linkage team will be onsite towards the end of the build to weld the handrails, linking them up to form a continuous BCA-compliant handrail. FTI Group is also supplying BlueDeck Composite™ metal decking formwork for the suspended concrete slabs.

Products Utilised
481 Fast Tread® Risers
700 m² of BlueDeck Composite®
159 LM of handrail

5

Levels

1

Basement

5

Buildings

420

Units

Fast FTI Facts

1500
Projects
35000
Floors
150000
Handrails (LM)

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements