The new Monash Medical Centre Car Park project is an extension to the existing car park. It’s designed to increase car parking capacity for staff and visitors, and to improve the safety and flow of pedestrian access on the site.
The extensions is an additional 468 car parking spaces over 4 levels with improved entry and exit points. Works are part of the existing Monash Medical Centre building in Clayton, VIC which is required to remain operational for staff and patients during the construction process.
Kane Constructions are constructing the new car park and they awarded the formwork package to KPA Concrete Construction. Off the back of a great experience at Bunnings Warehouse in Preston, KPA chose to use BlueDeck Composite™ again for Clayton. BlueDeck Composite™ is installed for the suspended concrete slabs throughout.
• AS/NZS1657:2018 for fixed platforms, walkways, stairways, and ladders • AS/NZS1428.1:2009 for design for access and mobility • AS/NZS1170.1:2002 for structural design actions • AS/NZS3990:1993 for mechanical equipment • AS/NZS4100:1998 for steel structures • AS/NZS4991:2004 for lifting devices • AS/NZS1554.1:2011 for structural steel welding • AS/NZS4761:2001 for steel reinforcing materials
Compliance assured for your peace of mind. For more information, contact our design team.