Projects

Featuring our FTI Group products

Heidelberg Road & Mills Boulevard, Alphington VIC
Products Utilised
365 Fast Tread® Risers

4

Levels

n/a

Basements

4

Buildings

197

Units

104 Studley Park Road, Kew VIC
Products Utilised
198 Fast Tread® Risers

3

Levels

n/a

Basements

1

Building

135

Units

245 – 251 Swan Street & Mary Street, Richmond VIC
Products Utilised
151 Fast Tread® Risers

6

Levels

2

Basements

1

Building

26

Units

210 Alexandra Parade East, Clifton Hill VIC
Products Utilised
184 Fast Tread® Risers

6

Levels

n/a

Basements

1

Building

33

Units

160 Whitehorse Road, Blackburn VIC
Products Utilised
511 Fast Tread® Risers

9

Levels

5

Basements

3

Buildings

187

Units

1 Warde Street, Footscray VIC
Products Utilised
972 Fast Tread® Risers

24

Levels

4

Basements

2

Buildings

380

Units

1-11 Gordon Street, Cremorne VIC
Products Utilised
189 Fast Tread® Risers

8

Levels

1

Basement

1

Building

n/a

Units

22 – 26 Riddell Parade, Elsternwick VIC
Products Utilised
392 Fast Tread® Risers

11

Levels

2

Basements

1

Building

24

Units

34 Cowper Street, Footscray VIC
Products Utilised
853 Fast Tread® Risers

10

Levels

n/a

Basements

4

Buildings

412

Units

9 – 11 Prospect Street, Box Hill VIC
Products Utilised
942 Fast Tread® Risers

25

Levels

5

Basements

1

Building

187

Units

Fast FTI Facts

Projects
1500
Floors
35000
Handrails (LM)
150000

You can trust Fast Tread®
to be compliant with:

• AS/NZS1657:2018
for fixed platforms, walkways, stairways, and ladders
• AS/NZS1428.1:2009
for design for access and mobility
• AS/NZS1170.1:2002
for structural design actions
• AS/NZS3990:1993
for mechanical equipment
• AS/NZS4100:1998
for steel structures
• AS/NZS4991:2004
for lifting devices
• AS/NZS1554.1:2011
for structural steel welding
• AS/NZS4761:2001
for steel reinforcing materials

Compliance assured for your peace of mind. For more information, contact our design team.