FTI-Group-logo
1300 751 701

Projects

Featuring our FTI Group products

Pathway to 144 Mental Health Beds

Cooper Street, Epping VIC

Part of the Victorian Government’s plan to deliver 144 new acute public mental health beds includes 120 hospital-based beds and 24 home-based beds. The new expansion of the Northern Hospital in Epping, VIC will provide 30 new mental health beds as part of this program. The delivery of the project will increase capacity, reduce pressure on emergency departments and provide support for people with mental illnesses who require immediate treatment.

Lendlease are the contractor for this project, who let the formwork package to Caelli Formwork. Caelli Formwork have engaged FTI Group in the supply of the stairs, handrails, and metal decking. Fast Tread® stairs are featured as standard circulation stairs in the fire shaft with 3 rail handrails. This is the second project Caelli has chosen to use BlueDeck Composite™ metal decking formwork for the suspended concrete slabs and they’ve been impressed with the decking system.

Products Utilised
181 Fast Tread® Risers
3,500 m² of BlueDeck Composite®
58 LM of handrail

3

Levels

0

Basements

1

Building

30

Units

Fast FTI Facts

1500
Projects
35000
Floors
150000
Handrails (LM)

UPLOAD YOUR PLANS NOW or CONTACT US

on +61 2 9052 5708 or sales@ftigroup.com.au to discuss your requirements