Southscape in South Perth, WA is a boutique development of 38 apartments spread over four floors with car parking spaces at ground level.
Thomas Building won the build contract for Southscape and from previous experience with FTI Group, had chosen to use Fast Tread® stairs again for this project. Fast Tread® stairs are featured in the fire shaft as standard circulation stairs.
• AS/NZS1657:2018 for fixed platforms, walkways, stairways, and ladders • AS/NZS1428.1:2009 for design for access and mobility • AS/NZS1170.1:2002 for structural design actions • AS/NZS3990:1993 for mechanical equipment • AS/NZS4100:1998 for steel structures • AS/NZS4991:2004 for lifting devices • AS/NZS1554.1:2011 for structural steel welding • AS/NZS4761:2001 for steel reinforcing materials
Compliance assured for your peace of mind. For more information, contact our design team.